Loading uranium into the first full scale plutonium reactor, the B Reactor, at Hanford, WA is completed. This reactor contains 200 tons of uranium metal, 1200 tons of graphite, and is cooled by 5 m^3 of water/sec. It designed to operate at 250 megawatts, producing some 6 kg of plutonium a month. Fermi supervises reactor start-up.
Date Range:
1944CE Sep 26th